MIL-PRF-44156E (GL)
4.3.1 Verification alternatives. The manufacturer may propose alternative test methods,
techniques, or equipment, including the application of statistical process control, tool control, or
cost-effective sampling procedures to verify performance. The contract may specify alternatives
that replace verifications required by this specification.
TABLE III. Matrix - Requirements vs verification methods
Title
Requirement
Verification
3.2
4.3.2
HEATER TANK OPERATING REQUIREMENTS
Heater tank, tray pack, size and configuration
3.2.1
4.3.2.1
Heater tank, tray pack, heating
3.2.2
4.3.2.2
Heater tank, tray pack, drainage
3.2.3
4.3.2.3
Heater tank, tray pack, leakage
3.2.4
4.3.2.4
Heater tank, tray pack, warning plates
3.2.5
4.3.2.5
Heater tank, tray pack, operating instructions plate
3.2.6
4.3.2.6
Griddle, size and configuration
3.3.1
4.3.2.7
Griddle, flatness
3.3.2
4.3.2.8
Griddle, surface
3.3.3
4.3.2.9
Griddle base, size and configuration
3.3.4
4.3.2.10
Chemical resistance
3.3.5
4.3.2.11
Safety
3.3.6
4.3.2.12
Sanitation/Cleaning
3.3.7
4.3.2.13
3.5
4.3.3
INTERFACE AND INTEROPERABILITY
REQUIREMENTS
Interoperability and interchangeability
3.5.1
4.3.3.1
3.6
4.3.4
SUPPORT OR OWNERSHIP REQUIREMENTS
Shelf life
3.6.1
4.3.4.1
Service life
3.6.2
4.3.4.2
Durability
3.6.3
4.3.4.3
Weight
3.6.4
4.3.4.4
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business